The Dalwallinu Gold Project (the ‘Project’) hosts a significant regional ground position over the Dalwallinu Greenstone Belt along the major Yerlering Fault Corridor. The Project includes over 20km strike length of prospective shear zone ground with historical geological, geochemical, structural and drill ready targets such as the Widgie Hill target Read more [...]
Dalwallinu Gold Project
Commodity: Gold
Development Stage: Exploration
Total Resource Estimate (M+I+I): • 7m @ 21.8 g/t Au from 20m (including 2m @ 61.5 g/t Au from 24m) • 9m @ 6.3 g/t Au from 19m (including 2m @ 18.2 g/t Au from 23m) • 6m @ 4.9 g/t Au from 12m • 6m @ 3.2 g/t Au from 13m