Concession area 7,753 hectares, located in Kutai Kartanegara of East Kaltim in Indonesia
-
Commodity: CoalDevelopment Stage: DevelopmentTotal Resource Estimate (M+I+I): Measured = 40,962,175.08 Tons, Indicated = 11,237,486.20 Tons, Suspected = 7,956,483.74 Tons
-
Coal Mine Central Kalimantan on sale USD 4.5 milion
Commodity: CoalDevelopment Stage: DevelopmentTotal Resource Estimate (M+I+I): Measured = 40,962,175.08 Tons, Indicated = 11,237,486.20 Tons, Suspected = 7,956,483.74 TonsPrice: $4,500,000concession area 9,905 hectares County Pasak Talawang District Kapuas ProvinceCentral Kalimantan For measured reserves of PT. Pelita Jaya Prima For Designated Reserves PT. PJP For Inferred Reserves PT. PJP For Indicated Reserves of PT. PJP Assuming SR (Striping Ratio) : 8,298,015 Mton : 12,447,023 Mton : 40,132,715 Mton : 95,409,873 Read more [...]
-
Coal Mine Central Kalimantan on sale USD 9 milion
Commodity: CoalDevelopment Stage: DevelopmentTotal Resource Estimate (M+I+I): Measured = 40,962,175.08 Tons, Indicated = 11,237,486.20 Tons, Suspected = 7,956,483.74 TonsPrice: $9,000,000concession area 2,710 hectares located in Indonesia at Central Kalimantan Province, Subdistrict South Barito
-
central Kalimantan Gold Mine TO USD 17 million
Commodity: GoldDevelopment Stage: ExplorationTotal Resource Estimate (M+I+I): 1,450,000 TonnPrice: $17,000,000A total of 10,020 Ha, IUP OP permits 6,265 Ha (ready to operate mining cultivation), and Exploration IUP status 3,755 Ha (CNC No. 121 MINE STRUCTURE : GEOGRAPHY / GEOLOGY : • Warukin Formation (TMW) • Sintang Breakthrough Rock (Toms) • Sepauk Tonalite (Kls) • Air Benakat Formation (Tma) ALLUVIAL Read more [...]
-
Nickel and iron ores mining for sale
Commodity: NickelDevelopment Stage: DevelopmentTotal Resource Estimate (M+I+I): 30 MtPrice: $30,000,000This greenfield project is contain deposit of nickel and iron ore. Buyer is welcome to drill to verify the existence of Nickel and iron ores deposit in the location. The location is in central sulawesi, in Indonesia. Data will be open during face to face meeting with buyer proof of Read more [...]
-
Gold mine for sale
Commodity: GoldDevelopment Stage: ProductionTotal Resource Estimate (M+I+I): 1,450,000 TonnPrice: $700,000,000Gold mine project is already operate traditionally due to limited capital located in Kalimantan